Part of the Novarc group since 2018

Since 1993, the ESP division has been built up through the addition of leading electrical safety product makes. The pooling of these new makes and industrial resources allows us to have a wide and consistent range. At the same time, the division continues to work on internationalisation and is gaining a foothold on all continents.

It is also familiarising itself with local environments and needs, in order to develop specific solutions.

1932

Price & Belsham established P&B Engineering

Price & Belsham established P&B Engineering

1937

The Weir Electrical Instrument company is formed in Bradford-on-Avon.

The Weir Electrical Instrument company is formed in Bradford-on-Avon.

1946

The Weir Electrical Instrument Company (Est. 1936) established the need for Gas and Oil operated Relays

The Weir Electrical Instrument Company (Est. 1936) established the need for Gas and Oil operated Relays

1947

Earthing Clamps commenced manufacture after WW2

PBwel-Electrical-Engineers-Corsham-about-us-history-NEW 1947

Earthing Clamps commenced manufacture after WW2

1963

Earth clamps for Running Rails were developed for British Rail

Earth clamps for Running Rails were developed for British Rail

1989

The Weir Electrical Company move from Bradford on Avon to Unit 10, Leafield Way.

PBwel-Electrical-Engineers-Corsham-about-us-history-NEW 1989

The Weir Electrical Company move from Bradford on Avon to Unit 10, Leafield Way.

1992

PBSI Group purchased The Weir Electrical Instrument Co., forming P&B Weir Electrical as a trading division

PBwel-Electrical-Engineers-Corsham-about-us-history-NEW 1992

PBSI Group purchased The Weir Electrical Instrument Co., forming P&B Weir Electrical as a trading division 

1994

P&B Weir achieve BS 5750 Part 1 : 1987, ISO 9001 : 1987 and EN 29001 : 1987

PBwel-Electrical-Engineers-Corsham-about-us-history-NEW 1994

P&B Weir achieve BS 5750 Part 1 : 1987,  ISO 9001 : 1987 and EN 29001 : 1987

1995

P&B Weir develop and launch the CE50 & CE51 Sub-Station Line End Clamps

PBwel-Electrical-Engineers-Corsham-about-us-history-NEW 1995

P&B Weir develop and launch the CE50 & CE51 Sub-Station Line End Clamps

1997

P&B Weir achieve ISO9001 : 1994

PBwel-Electrical-Engineers-Corsham-about-us-history-NEW 1997

P&B Weir achieve ISO9001 : 1994